


AI Infrastructure for the Next Decade
Green Energy. GPU ready. Asia Pacific First
Dual Engine Strategy
Two complementary approaches to capture the AI infrastructure opportunity
Light Asset
Operator Service Model
Strategy
Provide management services, power management, and AI computing scheduling for third-party data centers.
Value
Lower CAPEX requirements. Rapid expansion through technology export.
Heavy Asset
Self-Built Model
Strategy
Own data centers in Singapore and strategic locations across the region.
Value
Infrastructure appreciation and long-term lease returns. Group renewable energy direct supply reduces operating costs by 15-25%.
Built for Performance
Enterprise-grade specifications designed for the most demanding AI workloads.
50kW
Power Density
Up to 50kW per rack
Liquid
Cooling System
Liquid cooling ready
100 Gbps
Network Fabric
High-speed interconnect fabric
99.99%
Uptime SLA
Enterprise-grade availability
<1.3
PUE Target
Industry-leading energy efficiency
B200
GPU Platform
NVIDIA B200 / B300 series
Our Competitive Moat
Power Advantage
Group renewable energy direct supply — the lowest cost green AI compute in Asia Pacific.
Strategic Location
Dual nodes in Singapore and Malaysia — the heart of Asia Pacific's digital infrastructure corridor.
Full-Stack Capability
From power generation to GPU compute — one-stop integrated solution, eliminating multi-vendor complexity.
Cost Leadership
Operating costs 15-25% lower than competitors through integrated green energy supply and operational efficiency.